At the CEFA Center, the water tower was finally put to rest into its useable position. It was not easy to get the heavy tower raised up from the bed of the truck then settled into its final verticle position. Now, the solar powered pump needs to be installed and the distribution pipes put into place before any water can be used. We had one good rain over a week ago, but we are still in need of watering the important trees so that they do not dry up. This is also very timely as we are getting ready to begin construction on the general CEFA ag building that will be 14 meters by 10 meters. We will be making 3,500 cement block brick at first and that will consume a lot of water.